Keep the master asset clear
Name the original artwork and use the revision approved by the brand owner. Identify the elements that must light and the parts that may be printed. Agree which proof each branch needs to sign off.
Measure and label by branch
A 24 in board at one counter and a 32 in board at another need separate dimensions and installation drawings. Write a carton label for each location and count by configuration. Record indoor or covered use, supply and dimming preferences, and the local limits for work hours.
Set an acceptance check
Ask whether the shipment arrives as one pallet or several parcels. Share the destination list and date when each site can accept boxes. Add the supplied part references to the purchase record so a remote or adapter can be identified by site if service is needed.
Questions before you order
Can I approve just one size?
Use the same artwork revision if appropriate. Approve each distinct size, configuration and installation drawing.
What should the supplier send back?
Request a per-site item list, totals, expected dates, proof references and the installation handoff details.